小众纪录片影视聚合

 找回密码
 立即注册
查看: 290|回复: 0

外语原版纪录片《 The 800 Million Pound Railway Station 》 - 纪录片1080P/720P/360P高清标清网盘迅雷下载

[复制链接]

6万

主题

6万

帖子

10万

积分

版主

Rank: 7Rank: 7Rank: 7

积分
108426
发表于 2021-12-13 04:05:01 | 显示全部楼层 |阅读模式
外语原版纪录片《 The 800 Million Pound Railway Station 》 - 纪录片1080P/720P/360P高清标清网盘迅雷下载

外语原版纪录片《 The 800 Million Pound Railway Station 》 - 纪录片1080P/720P/360P高清标清网盘迅雷下载

The 800 Million Pound Railway Station






纪录片关键词:


The 800 Million Pound Railway Station,Boot Camp,Building Big,Confessions from the Underground,Going Underground,Inside King's Cross: The Railway,London Underground Revealed,Man Made Marvels: Taipei 101,The Art of Travel,The City of Culture,The Trouble with Our Trains

Technology,Bernard Hill,BBC,2007,English,Architecture


纪录片内容简介:

General Information:
Technology Documentary narrated by Bernard Hill and  published by BBC in 2007- English  narration

Information
St Pancras station sits at the end of a massive £5.8 billion railway line- the first major British line to be built for over a century. This new series tells the story of the architects, engineers and spin doctors who entered a frantic two year race to make the Royal Opening on time. There were huge financial incentives, but many personal reputations at stake.

The Devil in the Detail
This episode tells the story of architect Alastair Lansley, whose expensive artistic vision unnerved the engineers.


Deadline
The engineers and builders are about to hit the biggest deadline on the project so far. The tracks which bring the trains into St Pancras must be moved from the east to the west side of the station, over the course of a single weekend. If they fail, the entire £5.8 billion project will be thrown off-schedule.
Meanwhile, Chief Architect Alastair Lansley receives some terrifying news that may prevent him from seeing the project through.


The Inspections
Engineers race to finish the base build of the station. Huge bonuses are at stake and if the engineers don't meet their deadline they could incur penalties of £50,000 a day until their work is finished. For 30 year old engineer Claire Clarr this is the biggest project of her career and a series of gruelling inspections will determine whether or not work on her section is signed off as complete. To add to the pressure Claire's boss Mark Allison delivers news which will change the course of her working life.


The Icon Men
With the base build complete, St Pancras must start its face lift. Commercial Director Mike Luddy dreams of creating a new style of station and of transforming St Pancras into a luxury destination in its own right.
Instead of fast food outlets he wants to install gastro pubs and fine dining. The highlight will be the longest champagne bar in Europe and a nine metre high bronze statue which he hopes will be an iconic centrepiece for the station.


The Sharp End
A team of spin doctors and marketing gurus have to sell Commercial Director Mike Luddy's vision for St Pancras station. They need to convince press and public that a place synonymous with prostitution, drugs and violent crime has been transformed into the chic destination station for Europe.
But deadlines are slipping and the picture looks very different on the ground. The builders are behind schedule, the 60 shops may not finish work on time and there are critical problems with the cherry on the St Pancras cake - a 9 meter statue specially commissioned for the station. And with the station opening in just a few weeks time and Eurostar already selling tickets from their new destination will St Pancras be ready in time?


The Unveiling
The culmination of 11 years work and £5.8 billion of public and private money.
While the builders and engineers labour 7 days a week to try and finish major construction works Head of Marketing Jon Teeman is planning an enormous opening ceremony. A 1,000 seat arena is being erected and Her Majesty the Queen has agreed to open the station. With an invitation list boasting the great and the good and the eyes of the world's media upon them the opening night has to be a success.
Meanwhile the station is still not finished and the builders must complete works in order for Eurostar to start running. With an expected 50 million passengers per year due to start travelling from the station on November 14th the deadline must be hit at all costs.


Technical Specs
Video Codec: XVID
Video Bitrate: 1662 kbps
Video Resolution: 400x704 (height x width)
Video Aspect Ratio: 4x7 (1:1,76)
Audio Codec: MPEG-1 Layer 3 (MP3) <0x0055>
Audio BitRate: 127 kbps
Audio Streams: 1
RunTime Per Part: 28 min 59,00 s (43475 Frames)
Part Size: 373,05 MB
Capped by: Adam Cook

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

外语原版纪录片《 The 800 Million Pound Railway Station 》 - 纪录片1080P/720P/360P高清标清网盘迅雷下载

下载地址:
(本链接可能为BT下载方式,需自备BT类下载工具。推荐使用115网盘离线下载,或使用其他具有离线下载功能的网盘)

游客
文件下载链接就在这里,在您回复评论成功后才能显示。
请勿回复无意义的灌水内容。


下拉页面到最底部回复或者【点击此处快捷回复】,回复后返回此处即可查看下载链接。
如您没注册本站会员,可以点击注册本站,注册后即可回复下载。

小贴士:【影视自媒体解说文案请移步:夏至文案解说网 www.xiazhi.vip

上一篇:电影《卡罗琳·科贝库斯:圣诞那些事》-蓝光4K/1080P/720P/360P高清标清网盘百度云BT种子磁力迅雷下载
下一篇:外语原版纪录片《 The AK-47 》 - 纪录片1080P/720P/360P高清标清网盘迅雷下载

相关帖子

回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

本版积分规则

Archiver|手机版|小众纪录片影视聚合 |网站地图

GMT+8, 2024-12-24 00:49 , Processed in 0.339054 second(s), 14 queries , Gzip On, Redis On.

Powered by 小众纪录片影视聚合 @2010-2023

Copyright © 2010-2024, https://www.xzjlp.com/.


免责说明:本站所有内容链接、图文介绍等均来自于互联网网友分享,本站仅支持web页面展示和文字介绍,绝不提供在线观看和存储服务,也不参与录制、上传、压片。若本站收录内容无意侵犯贵司版权,请发邮件到【a885185#163.com】联系本站,我们将在第一时间删除侵权内容。谢谢!

快速回复 返回顶部 返回列表